Skip to content
Piotr Kaniewski
All materials
Article IT contracting Included in your subscription

An agile contract that survives an audit

Scope described by the way of working rather than a feature list — and how to square that with accountability and the person who audits it later.

Piotr Kaniewski · 27 February 2026 · 10 min read

This is placeholder text — the structure and length match the intended material, but the content has not been written or reviewed by Piotr. Do not quote it.

The question that comes up most often here is "are we allowed to". That is the wrong question — or rather, a question asked two steps too late. Before we get to whether you are allowed, we have to settle what the thing actually is and who, in this configuration, answers for it.

In practice three things decide it: what the data flow looks like, who makes the decision at the end of that flow, and what happens when the decision turns out to be wrong. Everything else follows from those three, rather than being a separate topic to analyse.

Where to start

Start by writing down what you already have, not what you ought to have. Most organisations have more than they think — policies, internal rules, clauses in vendor contracts — but nobody has put them side by side and checked whether they say the same thing.

Only against that background can you see the gaps that genuinely need closing. Skip the step and you produce one more policy that contradicts the previous two, and it is the contradiction that becomes the problem once somebody asks.

Where this usually breaks

It breaks at the seam: where the document describes one process and the team works to another. A clause nobody follows is worse than no clause — an absence can be explained, whereas an unfollowed clause proves you knew and did nothing about it.

So every conclusion here is phrased as a question to ask inside your own organisation rather than a clause to paste. A clause without a process behind it is decoration.

The rest is in the subscription

Full access to the materials, training recordings and model clauses. Updates land automatically, at no extra cost.

  • every article and explainer
  • downloadable checklists and model clauses
  • training and webinar recordings
  • new materials every month
Choose a plan

Already have access? Sign in

Related materials